PLANNING ENGINEER


Some of my friends have been asking me about “what does a planner do?", "What are the responsibilities of a planner?”

Well a Planner's job descriptions and responsibilities are slightly different from industry to industry. However, the main activities include, but are not limited to, the following:-


  • He needs to understand work scope, quantity and should be familiar with logical sequences in terms of engineering, manufacturing and construction disciplines. 
  • He needs to conduct field scoping to clarify scope as required. 
  • He must understand WBS structure, and has to work with management and project/maintenance team in the development of work break down structure for progress measurement, scheduling, cost estimating and project control. 
  • He has to prepare and manage overall master schedule integrating work breakdown structure using scheduling software. (Primavera, MS project, Asta power projects etc) 
  • He should understand contractual matter, earn value method, familiar with scope management and change control. 
  • He needs to coordinate schedule from multiple contractors/Sub contractors and incorporate the information gathered into the overall project master schedule. 
  • He has to prepare cost estimation and schedule bar chart plan considering all in puts (manpower, equipment’s and materials) availability, production and construction sequences. 
  • He has to provide work method statement or procedure as required. 
  • He should be able to utilize planning tools such as MS excel, MS Project, Primavera, Asta power projects & SAP 
  • He should develop and update resources (manpower and equipment) histogram weekly or monthly as required. 
  • He has to implement plan versus actual progress charts (histograms/S curves). Prepare reports and analyses deviations from plan. 
  • Track, monitor and forecast progress of all activities and deliverable such as products, engineering documents, fabrication status and construction of all discipline. 
  • Analyze gaps between the planned and actual progress and highlight the areas of concern which required action of the associate task member. 
  • Prepare and update three weeks and three months look-ahead schedule that reflect the priority activities. 
  • Liaises with all team leaders/members to communicate required completion dates and interface between functional team/operational team and project team. 
  • He should participate in all meetings (i.e. schedule review meeting, progress meeting, coordination meeting, constructability review meeting and so on).